Site icon IndoreHD

32 Pictures of Preparation which shows that the Ujjain Simhastha 2016 will be a great event.

32 Pictures of Preparation which shows that the Ujjain Simhastha 2016 will be a great event!

Ujjain Simhastha 2016is the Biggest Event of India this Year. The development of Ujjain city as religious  hub is on way  of completion. The event will definitely take the City to new heights on a global  level.

Madhya Pradesh CM Shivraj Singh Said “a resolve is being fulfilled, a dream is coming true. Ujjain is being developed as a city of everyone’s dream in unique and unparalleled way. In view of Simhastha, state  Government had started preparations for Simhastha before assembly elections. No stone has been left unturned to ensure success of this religious and spiritual event in this Holy City dotted by unique places.”

The Duration of Event will be 30 days, from 22 April to 21 May 2016.

Tentative Area:– 3000+ hectares.

The Entire area is divided into 6 Zones and 22 Sectors

Mahakaal Zone, Dutta Akhara Zone, Mangalnath Zone, Kal Bhairav Zone, Triveni Zone, Chamunda Mata Zone.

Here are the current Pictures of preparations which shows , Ujjain Simhastha will be a geat event.

The Ghats will become divine,

Triveni Ghat: 

There is a temple of Navagraha, the nine planets, on the Triveni ghat, It is a prominent centre of attraction for the pilgrims. There is a confluence of Khan River and River Saraswati (which is mythologically believed as invisible) near Triveni ghat on the Shipra.

For beautification of river, barrage will be constructed to prevent the water from Khan River to fall into Kshipra River.

These ghats were developed by the Water Resource Department for the purpose of the devotees who come for Simhasth Maha Kumbh or the Holy Bath.

Shipra River

The beautification of roads are going on, the effort of government are clearly visible. The cleanliness and greenery are making them really beautiful.

Entire length of 4-lane Indore-Ujjain road has been beautified.

To increase greenery saplings are planted on both sides of roads. 

Widening of roads and repairing of railing  of bridge on Kshipra river on Indore road are going on. 

Mangalnath Bridge

Central lighting on roads has done.

DRP Line Square

Hariphatak char bhuja

Interpretive center

Mangalnath four lane

Samannatar Bridge

Dewas- Maksi four lane road

At the time of Simhasth Kumbh Mela  the Load Requirement would be: 82 MVA for that out of 35 sanctioned works and 11 works are completed.

Overhead tanks are constructed to supply the drinking water during the Simhastha.

Pani tank bhoki mata

Shib khedi filter plant

Gambhir pump house

Gauv Ghat filter plant

The food zone of Mahakal is ready for Pilgrims

Chintaman Suvidha waiting for pilgrims

Homegaurd barek at Bharawgad

Homegaurd barek at DRPline

Mahakal Nandi Hall 

Beautiful Neel Ganga Talab

Rudra Sagar undergoing construction phase

Simhasth Mela Office is ready for Simhsatha 2016

Ranoji ki chatri

Shib Khedi Jalashay

Disclamer – We do not own and do not claim to own all the images appearing on this blog. The images belong to their respective owners (Mp Tourism), who have copyright over them. The images are taken from various different sources. If you feel that any image violates your copyright, please write to to have it taken down.

Exit mobile version